Emergency On-site Fuel Testing and Consulting

Summary

Peak Petroleum was brought in to settle a dispute between 2 fuel handlers.

Description

PPTS arrived on site within 24-48 hours (within a 250 mile radius) with equipment in hand, ready to perform analysis which settled the dispute and kept both parties satisfied. The  pipeline was then turned back on and business continued unabated as a result of these important on site testing procedures. PPTS often drives through the night, performs analysis  on holidays and/or weekends to satisfy their customers.